Kibey Innovations

Guide

The SBIR Phase I Cost Volume Checklist

Most Phase I proposals do not lose on the science. They lose on the cost volume, because the technical team writes it last, at midnight, the day it is due. The cost volume is where a reviewer decides whether you understand the work well enough to price it. Here is how to build one that holds up.

Before you touch a number

Read the solicitation twice. The controlling document is the BAA or component instructions, not the topic. It sets your ceiling, your period of performance, and what the cost volume must contain. DoD Phase I awards are usually feasibility studies of roughly six months, and the dollar ceiling is set per component and per topic. Do not assume last year's number.

Confirm three things and write them down:

The line items reviewers actually check

The three tie-outs that catch errors

  1. Every labor hour maps to a task in the technical volume.
  2. Every task in the technical volume has funded hours.
  3. The total equals the ceiling or comes in under it, never a dollar over.

The mistakes that get you rejected without a read

Bottom line

The cost volume is a credibility test disguised as a spreadsheet. Build it alongside the technical volume, not after it, and make the two agree line for line.

Let the math and the tie-outs be done for you

The cost estimating and proposal tools on the platform build the cost volume alongside the technical narrative and hold them to each other. Or get the weekly digest and see the SBIR topics worth pricing before the deadline crush.